Click on ballot measure for more detail.
- Measure D.
Quality Teacher and Academic Instruction Preservation Measure
-- Cotati/Rohnert Park Unified School District
(Parcel Tax - 2/3 Approval Required)
Pass:
6,929 /
66.9% Yes votes ......
3,430 /
33.1% No votes
- To protect quality education with local funding that cannot be taken by the State, shall Cotati-Rohnert Park Unified School District preserve reading/writing/math/science programs; keep school libraries open/available for students; protect art/music/vocational instruction; and attract/retain qualified teachers, by levying $89 per parcel annually for five years, with exemptions for senior citizens, independent citizen oversight, no money for administrators' salaries, and all funds staying local?
- Measure E.
Bonds
-- Healdsburg Unified School District
(55% Approval Required)
Pass:
2,790 /
61.4% Yes votes ......
1,756 /
38.6% No votes
- Without increasing current tax rates, to improve the quality of education at Healdsburg High and Healdsburg Junior High, repair leaky roofs, improve student access to computers/modern technology, add science labs, lower energy costs by upgrading electrical/plumbing systems and installing solar panels, shall Healdsburg Unified School District acquire,construct,repair schools/sites/facilities/equipment by issuing $35,000,000 of bonds at legal interest rates, with independent citizens' oversight, no money for administrators nor be taken by the State?
- Measure F.
Bonds
-- Guerneville School District
(55% Approval Required)
Pass:
993 /
64.8% Yes votes ......
540 /
35.2% No votes
- To improve the quality of education, improve student access to computers and modern technology, make health and safety improvements, modernize outdated classrooms and restrooms, improve energy efficiency by installing solar panels, modernize playgrounds and playfields, and replace outdated heating, ventilation and air-conditioning systems, shall the Guerneville School District issue $6,000,000 of bonds at legal interest rates, have an independent citizens' oversight committee and have no money used for administrative salaries or be taken by the State?
- Measure G.
Bonds
-- Old Adobe Union School District
(55% Approval Required)
Pass:
3,391 /
56.8% Yes votes ......
2,578 /
43.2% No votes
- To improve the quality of education, repair or replace leaky roofs; improve student access to computers and modern technology; modernize outdated classrooms, restrooms and school facilities; replace old heating, ventilation and air-conditioning systems; replace deteriorating plumbing systems; and make health and safety improvements; shall the Old Adobe Union School District issue $26,000,000 of bonds at legal interest rates, have an independent citizens' oversight committee and have no money used for administrative salaries or be taken by the State?
- Measure H.
Bonds
-- Sebastopol Union School District
(55% Approval Required)
Pass:
2,869 /
70.1% Yes votes ......
1,225 /
29.9% No votes
- To improve the quality of education; repair leaky roofs; improve energy efficiency by installing solar panels; repair deteriorating plumbing systems; improve student access to computers and modern technology; replace outdated HVAC systems; and renovate,repair,construct and/or upgrade classrooms,restrooms and school facilities; shall the Sebastopol Union School District issue $9,000,000 of bonds at legal interest rates, have an independent citizens' oversight committee and have no money used for administrative salaries or be taken by the State?
- Measure I.
Bonds
-- Wright School District
(55% Approval Required)
Pass:
1,913 /
62.2% Yes votes ......
1,165 /
37.8% No votes
- To improve the quality of education; repair or replace leaky roofs; improve student access to computers and modern technology; construct additional classrooms, restrooms and school facilities; improve energy efficiency; upgrade inadequate electrical systems; make health and safety improvements; and replace old plumbing systems; shall the Wright Elementary School District issue $14,000,000 of bonds at legal interest rates, have an independent citizens' oversight committee and have no money used for administrative salaries or be taken by the State?
- Measure J.
Sales Tax
-- City of Sonoma
(Majority Approval Required)
Pass:
2,208 /
67.1% Yes votes ......
1,083 /
32.9% No votes
- To preserve the safety, public services and quality of life of Sonoma, and provide funding for essential services such as police, fire and emergency medical services, street and road maintenance and repairs, flood prevention, park and open space maintenance, graffiti abatement and other general community services, shall an ordinance be adopted temporarily increasing the City sales tax by one-half of one percent for a term of 5 years, with all funds to be spent locally?
- Measure K.
Increase Board of Directors
-- Schell-Vista Fire Protection District
(Majority Approval Required)
Pass:
783 /
63.9% Yes votes ......
443 /
36.1% No votes
- Shall the number of the Schell-Vista Fire Protection District Board of Directors be increased from three (3) to five (5)?
|
|
This election is archived. Any links to sources outside of Smart Voter may no longer be active. No further links will be added to this page.
|
Links to sources outside of Smart Voter are provided for information only and do not imply endorsement.
|