Click on ballot measure for more detail.
- Measure O-2010.
City Clerk and Treasurer Appointed Positions
-- City of Guadalupe
(Majority Approval Required)
Fail:
470 /
49.95% Yes votes ......
471 /
50.05% No votes
- Shall the offices of city clerk and city treasurer be appointive?
- Measure P-2010.
Vital Public Service Protection Measure
-- City of Guadalupe
(Majority Approval Required)
Fail:
269 /
27.53% Yes votes ......
708 /
72.47% No votes
- To help preserve, enhance and improve the infrastructure, safety and character of Guadalupe, shall an ordinance be adopted to increase the City of Guadalupe utility users tax from 5 percent to 7.5 percent for a period of six years?
- Measure Q-2010.
Santa Barbara County High School/Secondary School Bond Measure
-- Santa Barbara High School District
(55% Approval Required)
Pass:
44370 /
70.04% Yes votes ......
18980 /
29.96% No votes
- To improve quality of local education, shall the Santa Barbara Secondary/High School District provide adequate classrooms, science labs, technology, and libraries; repair/replace outdated electrical, plumbing, heating/ventilation, infrastructure systems and deteriorated portable classrooms; fix leaking roofs; improve disabled student access; and improve educational academy and career technology facilities by issuing $75,000,000 in bonds at legal interest rates, with no money for administrator salaries and with oversight by a citizens' committee ensuring funds are spent on local school improvements?
- Measure R-2010.
Elementary School District Bond Issue
-- Santa Barbara Elementary School District
(55% Approval Required)
Pass:
19579 /
71.99% Yes votes ......
7619 /
28.01% No votes
- To improve quality of local education, shall the Santa Barbara Secondary/High School District provide adequate classrooms, science labs, technology, and libraries; repair/replace outdated electrical, plumbing, heating/ventilation, infrastructure systems and deteriorated portable classrooms; fix leaking roofs; improve disabled student access; and improve educational academy and career technology facilities by issuing $75,000,000 in bonds at legal interest rates, with no money for administrator salaries and with oversight by a citizens' committee ensuring funds are spent on local school improvements?
- Measure S-2010.
Proposed Sales Tax for Crime Reduction, Fire Protection and Jail Construction/Operation
-- County of Santa Barbara
(2/3 Approval Required)
Fail:
48590 /
39.24% Yes votes ......
75250 /
60.76% No votes
- Shall the County of Santa Barbara Ordinance to strengthen front-line law enforcement and fire protection within the County of Santa Barbara and Buellton, Carpinteria, Goleta, Guadalupe, Lompoc, Santa Barbara, Santa Maria, and Solvang and Carpinteria-Summerland, Montecito and County Fire
Districts, construct and operate a 304-bed jail, repair existing correctional infrastructure and fund repeat
offender reduction efforts and alternatives-to-incarceration, with a 1/2 percent Transactions (Sales) and
Use Tax increase beginning 7/01/2011 through 6/30/, and advisory committee oversight be approved?
- Measure T-2010.
Prohibition of Storefront Marijuana Dispensaries
-- City of Santa Barbara
(Majority Approval Required)
Fail:
11279 /
38.76% Yes votes ......
17818 /
61.24% No votes
- Shall an Ordinance to amend the City's Zoning Ordinance to prohibit the operation or maintenance of storefront marijuana dispensaries within the City of Santa Barbara be adopted?
|
|
This election is archived. Any links to sources outside of Smart Voter may no longer be active. No further links will be added to this page.
|
Links to sources outside of Smart Voter are provided for information only and do not imply endorsement.
|